Raw Parcels Turned Into Buildable Pads
Lot Preparation in Ashley for vacant acreage and field ground that need clearing and grading before construction
Many lots in this area were rural acreage or former field ground, so they need clearing and grading before they can take a driveway or foundation. Keller Bros starts with a walk of the lot to confirm the building location, property lines and where a driveway will enter, then clears brush and small trees, pulls stumps where needed, and grades the pad and access to design elevations. The family-run team handles clearing, dirt work and driveways with one crew, and free estimates are offered on all work.
The process begins with a site walk to mark the building footprint, confirm property boundaries and plan the driveway route. Brush and small trees are cleared from the work area, and stumps are pulled where the pad or access will sit. The crew then grades the pad and driveway to the elevations shown on the site plan, cutting high areas and filling low spots to create a stable surface for construction equipment and foundation forms.
Request a site consultation to walk your lot and confirm clearing, grading and access requirements.

The Difference Between Clearing and Grading
Clearing removes vegetation and stumps from the footprint and access route, while grading shapes the pad to the elevation the foundation crew needs and cuts the driveway slope to match the road entry. Both steps are required to take a wooded or overgrown lot to a buildable state.
When lot preparation is complete, you see a cleared footprint free of brush and stumps, with the pad graded to a consistent height and the driveway route cut to a usable slope. Construction equipment can access the building site without getting stuck, and the foundation crew has clean, level ground to work on.
The estimate lists clearing, hauling and fill as separate line items so you know what is covered and what drives the total cost. Scope includes confirming whether cleared brush is hauled off site or piled, and whether fill material needs to be brought in to reach final pad elevation.
Questions Before Starting Your Project
Homeowners preparing vacant lots in Johns and Pleasant often ask about the sequence of work and what needs to happen before the foundation contractor can start.
What happens during the initial site walk?
The crew confirms the building location, property lines, driveway entry point and any trees or features you want preserved, then identifies what needs to be cleared and how much grading is required.
How are stumps removed from the building pad and driveway route?
Stumps are pulled with an excavator and hauled off site, or ground below grade if they fall outside the pad and won't interfere with construction or drainage.
Why is grading necessary even on a relatively flat lot?
Field ground that looks level often has subtle high and low spots that trap water or prevent proper foundation drainage, and grading corrects those elevations before the building goes in.
What is included in lot preparation versus what the foundation contractor handles?
Lot prep clears vegetation, removes stumps, and grades the pad to the planned elevation, while the foundation crew handles excavation for footings and utility trenches once the pad is ready.
How is the driveway route graded during lot preparation?
The access is cut to a slope that matches the road entry and provides a stable path for concrete trucks and equipment, with the final driveway surface installed after foundation work is complete.
Keller Bros also prepares lots in St. Johns, Pleasant, Ithaca, Alma and Breckenridge. Call (989) 331-1868 for a free estimate that breaks out clearing, grading and fill requirements for your parcel.